ABOUT SPS Technocrats


Projects – Ongoing


Detail Design

Construction of two-Lane with paved shoulders of Joram – Koloriang Road (NH-713) on EPC basis from existing Km 20.000 to Existing End Chainage [DesignKm 20.000 to Design End Chainage](Design Length - 118 Km) in the state of Arunachal Pradesh under SARDP-NE – 8 Packages Widening and upgradation to 2 lane with paved shoulder configuration and geometric improvements from km 125.000 to km 166.000 on Aizawl-Tuipang section (Package-3) of NH-54 in the state of Mizoram with JICA loan assistance.

Widening and upgradation to 2 lane with paved shoulder configuration and geometric improvements from km 250.000 to km 298.000 on Aizawl-Tuipang section (Package-6) of NH54 in the state of Mizoram with JICA loan assistance.

Widening and upgradation to 2 lane with paved shoulder configuration and geometric improvements from km 339.000 to km 380.000 on Aizawl-Tuipang section (Package-8) of NH54 in the state of Mizoram with JICA loan assistance.

Construction and Maintenance of
• 154 m span steel superstructure bridge at Km 145.090 over River Barak.
• 122 m steel superstructure bridge at Km 189.800 over River Makru on JIRIBam- Barak road on NH-53 in the state of Manipur on EPC basis.

Order for Consultancy / Designing & Drawing Service of Launching Scheme for ROB with 54mtrs Clear Span Bow-Sting Girder in Thakur Ganj in the State of Bihar.

Construction of Border fencing Road along Indo- Bangladesh Border from near BP No - 1301/5s to BP no. 1316/m Approx. Length 18.0 Kms - Conduction Topographical Survey and Detail Design & Drawing for 3nos. Bailey Bridges -Reg.

Consultancy services for the work “ widening of existing road to 2-Lane standards along with improvement and realignment from potin to pangin via yachuli,Ziro,Daporizo,Along ( Pkg.- 4,Design Chainage from Km 117.560 to 163.590 ) on NH-13 in Arunachal Pradesh on EPC mode under Arunachal Pradesh package of SARDP-NE.

Consultancy Services for the work “ widening of existing road to 2-lane standards along with improvement and realignment from potin to pangin via Yachuli,Ziro,daporizo,along ( Pkg-6,Design chainage from Km 206.660 to Km 247.050) on NH-13 in Arunachal Pradesh on EPC mode under Arunachal Pradesh package of SARDP-NE.

Consultancy Services for the work”widening of existing road to 2-lane standards along with improvement and realignment from potin to pangin via yachuli,Ziro,daporizo,Aalong ( Pkg3,Design chainage from Km. 77.950 to Km 117.560) on NH-13 in Arunachal Pradesh on EPC mode under Arunachal Pradesh package of SARDP-NE.

“Widening to 2 ( Two) Lane with hard shoulder of Churachandpur to Tuival section of NH 102B from Km 32.835 Km to 48.587 Km.( Package -2A) in the state of Manipur on Engineering,Procurement & Construction( EPC)mode.

“Widening to 2 ( Two) Lane with hard shoulder of Churachandpur to Tuival section of NH 102B from Km 118+850 to Km. 130+000 ( Package -4A) in the state of Manipur on Engineering,Procurement & Construction( EPC)mode.


DPR


➢ Bhager Panol-Berthin Ghoridhabiri- Maharal Bijhari Salooni-Galore-Kangu- Lalari (Bhatha) (Road Length 71.20 km) & ii) Didwin Tikkar - Mahal Bhoranj- Chandruhi Tatahar (Sarkaghat.) (Road Length 28.80 km) Himachal Pradesh. (Package No. -HP-4)

Manpul-Gauna-Basaral-Dhaneta-Tipper-Fahal Galore-Budhawin Chowk Nalti-Hamirpur (Junction of Hamirpur Bye-Pass) (Road Length 50.50 km) & ii) Hamirpur (Mattan Sidh) Dosarka-Lambloo Tarak wadi-Bhoranj-Jahoo. (Road Length 34.00 km) Himachal Pradesh. (Package No. HP-7)

Two laning of Hukanjuri to Khonsa road section of NH-315A from Ch-0/000 Km to 26/342 Km in the state of Arunachal Pradesh.

Preparation of DPR of NH-415 of Schemes under NH (O) - TSP and NH (O) -Stage Strengthening Annual Plan 2019-20 in the State of Arunachal Pradesh (4 Laning of Itanagar-Bandewa section Of NH-415- Regarding Submission of Cost Estimate Package-B (Km 40+400 to 51+600) and Package - C (Km 51+600 to 59+170).

Consultancy Services for Preparation of Detailed Project Report (DPR) for 4-Lanning of Itanagar to Bandardewa Section NH-415 from Chainage Km 40+430 to Km 51+735 in the state of Arunachal Pradesh (Package-B).

Consultancy Services for Preparation of Detailed Project Report (DPR) for 4-Lanning of Itanagar to Bandardewa Section NH-415 from Chainage Km 51+700 to Km 59+199 in the state of Arunachal Pradesh (Package-C).

Consultancy Services for Preparation of Detailed Project Report (DPR) Protection & Mitigation of Landslides and Erosion of road formation from Hollongi to Itanagar (Km 10+00 to Km 29+50) on 4-Lane NH-415.


PMC


Four Laning of NH-37 from Nagaon to Rangagara (Km 278.600 to Km 297.000) in Nagaon District in the State of Assam under SARDP-NE, Phase A on EPC Mode.

Four Laning of Jamugurihat to end of Biswanath chariali by-pass from km 182.000 to km 208.000 of NH-52 in the state of Assam on EPC basis.

Four Laning Of NH 52 From End of Biswanath Chariali By-Pass (Km 208.00) to Gohpur (Km 265.50) (Total Length = 57.50 Km) in the State of Assam on EPC Basis.