ABOUT SPS Technocrats


Projects – Completed


Detail Design

Four Laning of NH-37 from Nagaon to Rangagara (Km 278.600 to Km 297.000) in Nagaon District in the State of Assam under SARDP-NE, Phase A on EPC Mode.

Four Laning of Jamugurihat to end of Biswanath chariali by-pass from km 182.000 to km 208.000 of NH-52 in the state of Assam on EPC basis.

Four Laning Of NH 52 From End of Biswanath Chariali By-Pass (Km 208.00) to Gohpur (Km 265.50) (Total Length = 57.50 Km) in the State of Assam on EPC Basis.

2-Laning from Changlang/Tirap District Boundary to Changlang section of NH52B (New NH-215) from km 0.00 to km 18.266 (Length 18.266 Km) in Arunachal Pradesh under Arunachal Pradesh package ofSARDP-NE

Four Laning of NH-415 from Design Chainage (Km 29.500 to 40.400) (Itanagar to Bandardewa Section) in the state of Arunachal Pradesh under Annual Plan 2016-2017 on EPC Mode.

2-Laning of Pasighat to Pangin Section Of NH-229 (New NH-13) from km 41.3 To Km 58.42 (Existing km 42 to km 59) (Length 17.12 km) in Arunachal Pradesh under Arunachal Pradesh Package Of SARDP-NE on EPC Basis.

2-Laning of Existing Akajan-Likabali Bame Road on EPC Basis from Design Km.33+000 to Km. 65+570(Existing Km 36+000 to 71+000) in the state of Arunachal Pradesh Under SARDP-NE

Rehabilitation and Upgradation to 2L+PS Configuration of Jalkot – Togari Section of NH-50 from Km 65.952 to Km 111.409 (Design Chainage) (excluding Km 96.240 to Km 96.820 and Km 97.190 to Km 97.895) in the State of Maharashtra through Engineering, Procurement and Construction (EPC) Mode. (Total Length-44.172 Km)

Construction of Two-Lane Road with Paved Shoulders from District Border Loha – Kandhar – Mukhed – Eklara – Khanapur – Narnagal – Sagroli- Biloli – Kundalwadi – Dharmabad to State Border MSH-16 & SH – 268 Dist. Nanded under Hybrid Annuity (MSH-16 from Loha km 297/400 to Khanapur Phata km 371/900).(Total Length-74.500 Km).

Design and Construction/Improvement of Balipara-Chariduar to Tawang Road Section of National Highway-13 from km 70.00 to km 88.00 from existing Cl-9 Specifications to NH Double Lane Specifications in the state of Arunachal Pradesh. (Total Length-18.000Km)

Construction of 2 Laning of existing Hunli-Anini from Design Km 120.000 to Km 130.300 (Total length = 10.300 Kms) in the state of Arunachal Pradesh on EPC basis under SARDP-NE

4-laning of NH-415 from design chainage 29/500 to 40/400 (Itanagar to Bandardewa section) in the state of Arunachal Pradesh under Annual Plan 2016-17 on EPC Mode. Package-A (length 10.9 Km).


DPR


Improvement of Longding-Bimlapur road (49.00 Km) (Strengthening of Existing Payment and Resurfacing) Phase-1 (10 Km) Under Inter-State Connectivity (ISC) in the State of ArunachalPradesh

Road from Gumto to Chandannagar via Doimukh - Bage Tinali - ISBT Pappu Tinali - Donyi Polo School - Panchali - Senkhi View and Chandannagar to connect 4-Lane Road (Pkg -Pappu Yupia Road to Donyi Polo Vidhya Bhawan School)

Steel Girder Bridge with RCC Decking over river Paschin in Between Papu village - II to Referral Hospital Site atNaharlagun

Steel Truss Bridge over River Pachin near helipad Connecting Borum village and Naharlagun.

Consultancy Service for Preparation of DPR for Proposed Major Bridge over Dikrong River on NH-713A (Yupia-Hoj) near Ranganadi Power House, Hoj.

Widening of Existing Road to 2 lane NH standards along with improvement andre- alignment from Potin to Pangin via Yachuli, Zero, Daporizo, Aalong (Parts of Trans Arunachal Highway) in Arunachal Pradesh on National Highway No. 13 on EPC Mode (Total Length = 406.70 Km)

Construction of minor bridge over Holongi river at Km 11+800 of New NH-415 (Old NH-52A) (RCC Girder & Slab) bridge over Holongi river.

Road from Gumto to Chandannagar via Doimukh - Bage Tinali - ISBT - Pappu Tinali - Donyi Polo School - Panchali - Senkhi View and Chandannagar to connect 4-Lane Road( Pkg -Pappu Yupia Road to Donyi Polo Vidhya Bhawan

Steel Girder Bridge with RCC Decking over river Paschin in Between Papu village - II to Referral Hospital Site at Naharlagun.

Steel Truss Bridge over River Pachin near helipad Connecting Borum village and Naharlagun

Construction of minor bridge over Holongi river at Km 11+800 of New NH-415 (Old NH- 52A)(RCC Girder & Slab) bridge over Holongi river.